As a UKAS-accredited Type A Inspection Body, NECIT delivers fully independent, third-party Welding Procedure Qualification Record (WPQR) and Welder Qualification Testing services to the engineering sector across the UK. We operate as a Registered Third Party Organisation (RTPO) under the UK Pressure Equipment Safety Regulation and maintain UKAS accreditation under both ISO/IEC 17020 (Inspection Bodies) and ISO/IEC 17024 (Personnel Certification).
This enables NECIT to certify welding procedures and welders to any international standard such as ISO 15614, ASME IX, and ISO 9606, with full technical oversight and traceable conformity to the applicable standards.
Preparing for Welding Procedure Qualification
Before a welding procedure can be formally implemented, a Preliminary Welding Procedure Specification (pWPS) must be developed. This forms the basis of the welding trial and outlines all relevant welding variables that must be qualified. The structure and content of a WPS or pWPS are typically aligned to ISO 15609-1 (Welding Procedure Specification for arc welding) or equivalent standards such as ASME Section IX, QW-482.
